JeltJoinelt
Joined: 06 Apr 2013 Posts: 2 Location: Tula
|
Posted: Sat Apr 06, 2013 1:40 pm Post subject: Construction |
|
|
Along with the undeveloped terrain, we also were forced to deal with a large slope differential on the jobsite. The property next to the building's rear parking lot included a large area of trees that we needed to leave undisturbed. To overcome the http://stroitel.net23.net slope differential we built an 800 liner foot, turn-up concrete retaining wall on the rear elevation. This allowed us to maintain the desired 3:1 slope and save the trees on the property adjacent to the parking lot. _________________ http://homapage.hostei.com |
|